In operation since: 2018
Annual volume:

roughly 100,000 tons
(roughly 3000 containers) 

Route:voestalpine Linz- Hamburg - voestalpine Linz
Number of trains: 1 - 2 round-trips per week
Special features:Decks traffic Hamburg - voestalpine Linz - CT Linz river port - Hamburg

North-south Eanos railcars loaded with ore to voestalpine Linz
After unloading at the works, transfer to CT Linz river port, where the railcars are cleaned and reloaded with containers

Types of railcars used:Eanos