Kickoff: | 1 April 2001 |
Annual volume: | roughly 725,000 tons |
Route: | From Steyrling Lime Works to voestalpine in Linz |
Number of trains: | Two daily round trips |
Special features: | Use of a radio-controlled electric locomotive at the loading point in Steyrling enables resource-optimized deployment of personnel. The cement plant in Kirchdorf is supplied in regular rail traffic with granulated blast furnace slag. |
Types of railcars used: | Tal, Talns, Fals, Falkv, Faalns |