In operation since:1 April 2001
Annual volume:700,000 tons of burnt lime and limestone chips
Route:voestalpine Linz location–Steyrling lime plant
Number of trains:2–3 pairs of trains per day
Special features:A remote-radio-controlled electric locomotive is used at the loading point in Steyrling.
The cement plant in Kirchdorf is supplied in regular rail traffic with granulated blast furnace slag.
Types of railcars used:Tal, Talns, Fals, Falkv, Faalns